Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareHICO 140 MVA 235/34.5/13.8 kV Transformer PairJJ-HICO-235-140-2120 MVA 138/34.5 kV Georgia Solar GSUJJ-TX-004
ManufacturerHICOGeorgia Transformer
Rating / output85/115/140 MVA72/96/120 MVA; 25.2/33.6/42 MVA tertiary
Voltage / winding arrangement235/34.5/13.8 kV138/34.5 kV with 12 kV buried-delta tertiary
Vector groupWinding connections and vector clock to confirmYNyn0+d1
FrequencyNot documented; confirm with J&J60 Hz
CoolingONAN / ONAF1 / ONAF2 representedONAN / ONAF1 / ONAF2
Impedance and baseNot documented; confirm with J&JMeasured H–X: 6.93% at 72 MVA; design value 7.2%
Tap changerNot documented; confirm with J&JHV OLTC; 117.3–158.7 kV (±15%); confirm the final switch and step schedule
Insulation / BILNot documented; confirm with J&JHV line 650 kV; HV neutral, LV line and LV neutral 200 kV
Quantity represented2 represented matching units1 documented unit
Technical details / open itemsThe received offer represents a matching pair at 85/115/140 MVA, 235/34.5/13.8 kV, with copper windings, three phases and ONAN/ONAF1/ONAF2 cooling.; The exact offered high-side rating is 235 kV. Compatibility with a 230 kV project must be established from the actual nameplates, taps, insulation and project requirements.; An early-October arrival in the United States was scheduled in the earlier offer. Arrival has not been confirmed and the units are not described as immediately available U.S. stock.; Individual condition and service history are unresolved; the pair is excluded from the new/unused and used/pre-owned filters until confirmed.; Request both individual nameplates, frequency, winding connections, tertiary duty, tests, preservation/service records, arrival evidence and written purchase and warranty terms.Solar GSU design; ONAN/ONAF1/ONAF2, 60 Hz, three-phase; Vector group YNyn0+d1 with HV OLTC and conservator oil system; Nameplate rating is used; an outline-drawing discrepancy requires final seller confirmation
Evidence reviewedReceived written offer for a matching pairSerial-specific nameplate and approval drawings reviewed
Technical value basisWritten offer for a matching pair; confirm both actual nameplates.Supplied unit nameplate; the nameplate takes precedence over the differing outline-drawing rating.
Details to confirmBoth nameplates, current condition/arrival, frequency, rise, connections and tertiary duty; Impedance/base, BIL, taps, factory/service tests, preservation, dimensions/weights and accessoriesResolve the outline-drawing rating discrepancy and confirm the final drawing revision; Current preservation, complete tests, dimensions and included accessory schedule
Represented conditionIndividual condition and service history require confirmationBrand new, never used and never energized; approval drawings reviewed
Equipment locationLocation confirmed with quotationUSA
Technical records reviewed2026-10-082026-10-08
AvailabilityEarly-October 2026 U.S. arrival was scheduled in the received offer; arrival and present allocation are unconfirmedAvailable; engineering package reviewed; subject to prior sale and written reconfirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themYes — request matching unit drawings
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist