Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | HICO 140 MVA 235/34.5/13.8 kV Transformer PairJJ-HICO-235-140-2 | 120 MVA 138/34.5 kV Georgia Solar GSUJJ-TX-004 |
|---|---|---|
| Manufacturer | HICO | Georgia Transformer |
| Rating / output | 85/115/140 MVA | 72/96/120 MVA; 25.2/33.6/42 MVA tertiary |
| Voltage / winding arrangement | 235/34.5/13.8 kV | 138/34.5 kV with 12 kV buried-delta tertiary |
| Vector group | Winding connections and vector clock to confirm | YNyn0+d1 |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | ONAN / ONAF1 / ONAF2 represented | ONAN / ONAF1 / ONAF2 |
| Impedance and base | Not documented; confirm with J&J | Measured H–X: 6.93% at 72 MVA; design value 7.2% |
| Tap changer | Not documented; confirm with J&J | HV OLTC; 117.3–158.7 kV (±15%); confirm the final switch and step schedule |
| Insulation / BIL | Not documented; confirm with J&J | HV line 650 kV; HV neutral, LV line and LV neutral 200 kV |
| Quantity represented | 2 represented matching units | 1 documented unit |
| Technical details / open items | The received offer represents a matching pair at 85/115/140 MVA, 235/34.5/13.8 kV, with copper windings, three phases and ONAN/ONAF1/ONAF2 cooling.; The exact offered high-side rating is 235 kV. Compatibility with a 230 kV project must be established from the actual nameplates, taps, insulation and project requirements.; An early-October arrival in the United States was scheduled in the earlier offer. Arrival has not been confirmed and the units are not described as immediately available U.S. stock.; Individual condition and service history are unresolved; the pair is excluded from the new/unused and used/pre-owned filters until confirmed.; Request both individual nameplates, frequency, winding connections, tertiary duty, tests, preservation/service records, arrival evidence and written purchase and warranty terms. | Solar GSU design; ONAN/ONAF1/ONAF2, 60 Hz, three-phase; Vector group YNyn0+d1 with HV OLTC and conservator oil system; Nameplate rating is used; an outline-drawing discrepancy requires final seller confirmation |
| Evidence reviewed | Received written offer for a matching pair | Serial-specific nameplate and approval drawings reviewed |
| Technical value basis | Written offer for a matching pair; confirm both actual nameplates. | Supplied unit nameplate; the nameplate takes precedence over the differing outline-drawing rating. |
| Details to confirm | Both nameplates, current condition/arrival, frequency, rise, connections and tertiary duty; Impedance/base, BIL, taps, factory/service tests, preservation, dimensions/weights and accessories | Resolve the outline-drawing rating discrepancy and confirm the final drawing revision; Current preservation, complete tests, dimensions and included accessory schedule |
| Represented condition | Individual condition and service history require confirmation | Brand new, never used and never energized; approval drawings reviewed |
| Equipment location | Location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Early-October 2026 U.S. arrival was scheduled in the received offer; arrival and present allocation are unconfirmed | Available; engineering package reviewed; subject to prior sale and written reconfirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist