Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-012 |
|---|---|
| Manufacturer | Siemens |
| Manufacturer basis | Written equipment offer; unit-specific technical records and identity to confirm |
| Rating | 24.5 MW reported per unit |
| Voltage / output | Generator voltage to confirm |
| Frequency | 50 Hz |
| Fuel | Fuel specification to confirm |
| Manufacture / history dates | 2017 reported overhaul date; manufacture year to confirm |
| Included package scope | Full turbine packages; completion and included equipment to confirm |
| Received offer date | |
| Quantity | 2 offered packages |
| Shipping | Completion and shipment schedule to confirm |
| Availability | Offered subject to prior sale; Completion and shipment schedule to confirm |
| Condition basis | Siemens overhaul in 2017 reported; being completed to zero-hour condition |
| Current location | Location confirmed with quotation |
| Written offer reviewed |
Technical highlights
- These are overhauled packages, distinct from the two new/unused packages.
- Zero-hour condition after completion does not mean zero lifetime hours or new manufacture.
- Request the overhaul report, subsequent storage history, final inspection and acceptance-test records.
Evidence reviewed
Written equipment offer; unit-specific technical records and identity to confirm
Records apply only to the stated unit or design basis.
Availability and terms
Offered subject to prior sale; Completion and shipment schedule to confirm
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Offered subject to prior sale; Completion and shipment schedule to confirm. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Full turbine packages; completion and included equipment to confirm. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-012, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.
