Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-015 |
|---|---|
| Manufacturer | Siemens |
| Manufacturer basis | Written equipment offer; unit-specific technical records and identity to confirm |
| Rating | 54 MW reported output |
| Voltage / output | 13.8 kV |
| Frequency | 60 Hz |
| Fuel | Biomass-fired steam cycle |
| Manufacture / history dates | Reported operation start 2022; manufacture year to confirm |
| Included package scope | Biomass steam power plant; full scope and steam conditions to confirm |
| Received offer date | |
| Quantity | 1 offered plant |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm |
| Condition basis | Used; low-hour condition represented, exact hours to confirm |
| Current location | Location confirmed with quotation |
| Listing information reviewed |
Technical values and record basis
Received equipment offer; ratings, history and scope are representations until matched to the selected package.
The reviewed offer does not establish additional unit-specific technical values. Request the matching nameplate and complete technical package through J&J.
Details to confirm for this listing
- Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests
- Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope
Technical highlights
- Request steam-turbine nameplates, inlet and exhaust conditions, generator ratings and maintenance records.
- Confirm boiler, fuel-handling, emissions, controls, balance of plant and removal scope.
- Availability was offered September 23 and requires current written reconfirmation.
Evidence reviewed
Written equipment offer; unit-specific technical records and identity to confirm
Records apply only to the stated unit or design basis.
Availability and terms
Offered subject to prior sale; current availability and release schedule to confirm
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Offered subject to prior sale; current availability and release schedule to confirm. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Biomass steam power plant; full scope and steam conditions to confirm. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-015, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.
