Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare116 MVA 138 kV Transformer Positions — 2027JJ-TX-20550 MVA-Class 138/13.8 kV Substation PackageJJ-TX-007
ManufacturerManufacturer disclosed in the qualified technical packageManufacturer to confirm
Rating / output116 MVA stated maximum30/39.9/50 MVA at 55 C; 33.6/44.7/56 MVA at 65 C
Voltage / winding arrangement138 kV HV; secondary voltage requires confirmation138 kV delta / 13.8 kV grounded wye
Vector groupRequires confirmationDelta–Grounded Wye; clock to confirm
FrequencyRequires confirmation60 Hz
CoolingNot documented; confirm with J&JONAN / ONAF / ONAF
Impedance and baseNot documented; confirm with J&JNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JFive-position HV DETC: 131.1, 134.55, 138, 141.45 and 144.9 kV (±5%, 2.5% steps)
Insulation / BILNot documented; confirm with J&JHV 650 kV; LV 110 kV, drawing basis
Quantity represented2 offered positions1 represented design package
Technical details / open itemsSeller offer summary; exact cooling stages require confirmation.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.Oil-immersed substation transformer; ONAN/ONAF/ONAF, 60 Hz, three-phase; HV de-energized tap range: 131.1-144.9 kV; Final impedance, serial number, test data, and manufacture date are not populated
Evidence reviewedSeller offer summary; exact cooling stages require confirmationProject-specific supplied approval drawings reviewed; final equipment OEM and serial identity require confirmation
Technical value basisReceived production offer and existing reviewed design package; final individual nameplates and factory tests remain pending.Supplied approval design drawings; a completed individual nameplate and final equipment identity have not been established.
Details to confirmMatch the final design/rating and drawing revision to each offered manufacturing position; Final frequency, cooling/rise, winding duty, impedance/base, BIL, taps, accessories and transport dimensions/weightsFinal OEM, individual equipment identity, manufacture year, tested impedance and factory reports; Final drawings, current preservation, complete accessories and shipping configuration
Represented conditionFactory manufacturing position; completion pendingBrand new, never used and never energized; 2024 approval drawings reviewed; serial identity requires confirmation
Equipment locationDispatch location confirmed with quotationUSA
Technical records reviewed2026-10-082026-10-08
Availability2027 manufacturing positions offered for allocation; current release terms require written confirmationAvailable; approval drawings reviewed; unit identity requires documentation; subject to prior sale and written confirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimateProjected 2027 completion; shipment and receiving dates require written confirmationRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itNot recorded as reviewed; request it
Drawings reviewedNot recorded as reviewed; request themYes — request matching unit drawings
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales