Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare345/34.5 kV Transformer Production PositionsJJ-TX-204260 MVA 345/34.5 kV Siemens TransformerJJ-TX-114
ManufacturerManufacturer disclosed in the qualified technical packageSiemens
Rating / output266 MVA offered; final rating requires reconciliation260 MVA
Voltage / winding arrangement345 kV HV / 34.5 kV LV345/34.5 kV
Vector groupRequires confirmationWinding connections and phase shift to confirm
Frequency60 HzNot documented; confirm with J&J
CoolingNot documented; confirm with J&JNot documented; confirm with J&J
Impedance and baseNot documented; confirm with J&JNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented2 offered positions1 schedule entry; individual identity to confirm
Technical details / open itemsSeller offer summary; exact cooling stages require confirmation.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; The offered summary states 266 MVA. Supplied outlines include different 226 MVA and 266 MVA designs without a confirmed match to each position. Resolve the individual nameplate and design before technical acceptance.Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing.
Evidence reviewedSeller offer summary; exact cooling stages require confirmationJ&J-submitted inventory schedule; matching unit-specific technical records to confirm
Technical value basisReceived production offer and existing reviewed design package; final individual nameplates and factory tests remain pending.Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match.
Details to confirmMatch the final design/rating and drawing revision to each offered manufacturing position; Final frequency, cooling/rise, winding duty, impedance/base, BIL, taps, accessories and transport dimensions/weightsIndividual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope
Represented conditionFactory manufacturing position; completion pendingCondition and service history require confirmation
Equipment locationDispatch location confirmed with quotationLocation confirmed with quotation
Technical records reviewed2026-10-082026-10-08
Availability2027 manufacturing positions offered for allocation; current release terms require written confirmationListed for inquiry by J&J; current allocation and release timing require written confirmation
Availability last confirmedRequest current confirmationRequest current confirmation
Shipping estimateProjected 2027 completion; shipment and receiving dates require written confirmationRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itNot recorded as reviewed; request it
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales