Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 345/34.5 kV Transformer Production PositionsJJ-TX-204 | 220 MVA 345/34.5 kV Prolec GE TransformerJJ-TX-002 |
|---|---|---|
| Manufacturer | Manufacturer disclosed in the qualified technical package | Prolec GE |
| Rating / output | 266 MVA offered; final rating requires reconciliation | 132/176/220 MVA; 46.2/61.6/77 MVA tertiary |
| Voltage / winding arrangement | 345 kV HV / 34.5 kV LV | 345/34.5 kV with 13.8 kV delta tertiary |
| Vector group | Requires confirmation | Grounded Wye–Wye / Delta; clock to confirm |
| Frequency | 60 Hz | 60 Hz |
| Cooling | Not documented; confirm with J&J | ONAN / ONAF / ONAF |
| Impedance and base | Not documented; confirm with J&J | Design H–X: 12.0% at 132 MVA |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 2 offered positions | 1 documented unit |
| Technical details / open items | Seller offer summary; exact cooling stages require confirmation.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; The offered summary states 266 MVA. Supplied outlines include different 226 MVA and 266 MVA designs without a confirmed match to each position. Resolve the individual nameplate and design before technical acceptance. | Collector step-up duty; ONAN/ONAF/ONAF, 60 Hz, three-phase; Grounded-wye / grounded-wye / delta winding configuration; Nominal design H-X impedance: 12.0% on a 132 MVA base |
| Evidence reviewed | Seller offer summary; exact cooling stages require confirmation | Serial-specific nameplate and approval drawings reviewed |
| Technical value basis | Received production offer and existing reviewed design package; final individual nameplates and factory tests remain pending. | Supplied nameplate and approval drawings; design values require matching final factory records. |
| Details to confirm | Match the final design/rating and drawing revision to each offered manufacturing position; Final frequency, cooling/rise, winding duty, impedance/base, BIL, taps, accessories and transport dimensions/weights | Final tested impedance, insulation levels, complete tap schedule and approved drawing revision; Overall and shipping dimensions, shipping weight, accessory schedule and current preservation |
| Represented condition | Factory manufacturing position; completion pending | Brand new, never used and never energized; approval drawings reviewed |
| Equipment location | Dispatch location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | 2027 manufacturing positions offered for allocation; current release terms require written confirmation | Available; nameplate and approval drawings reviewed; subject to prior sale and written confirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Projected 2027 completion; shipment and receiving dates require written confirmation | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist