Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 260 MVA 345/34.5 kV Siemens TransformerJJ-TX-114 | 345/34.5 kV Transformer Production PositionsJJ-TX-204 |
|---|---|---|
| Manufacturer | Siemens | Manufacturer disclosed in the qualified technical package |
| Rating / output | 260 MVA | 266 MVA offered; final rating requires reconciliation |
| Voltage / winding arrangement | 345/34.5 kV | 345 kV HV / 34.5 kV LV |
| Vector group | Winding connections and phase shift to confirm | Requires confirmation |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 schedule entry; individual identity to confirm | 2 offered positions |
| Technical details / open items | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. | Seller offer summary; exact cooling stages require confirmation.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; The offered summary states 266 MVA. Supplied outlines include different 226 MVA and 266 MVA designs without a confirmed match to each position. Resolve the individual nameplate and design before technical acceptance. |
| Evidence reviewed | J&J-submitted inventory schedule; matching unit-specific technical records to confirm | Seller offer summary; exact cooling stages require confirmation |
| Technical value basis | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. | Received production offer and existing reviewed design package; final individual nameplates and factory tests remain pending. |
| Details to confirm | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope | Match the final design/rating and drawing revision to each offered manufacturing position; Final frequency, cooling/rise, winding duty, impedance/base, BIL, taps, accessories and transport dimensions/weights |
| Represented condition | Condition and service history require confirmation | Factory manufacturing position; completion pending |
| Equipment location | Location confirmed with quotation | Dispatch location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Listed for inquiry by J&J; current allocation and release timing require written confirmation | 2027 manufacturing positions offered for allocation; current release terms require written confirmation |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Projected 2027 completion; shipment and receiving dates require written confirmation |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist