Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 26.7 MVA 46/12.47 kV Virginia TransformerJJ-TX-104 | 220 MVA 345/34.5 kV Prolec GE TransformerJJ-TX-002 |
|---|---|---|
| Manufacturer | Virginia Transformer | Prolec GE |
| Rating / output | 16/21.3/26.7 MVA | 132/176/220 MVA; 46.2/61.6/77 MVA tertiary |
| Voltage / winding arrangement | 46/12.47 kV | 345/34.5 kV with 13.8 kV delta tertiary |
| Vector group | Winding connections and phase shift to confirm | Grounded Wye–Wye / Delta; clock to confirm |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | Not documented; confirm with J&J | ONAN / ONAF / ONAF |
| Impedance and base | Not documented; confirm with J&J | Design H–X: 12.0% at 132 MVA |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 schedule entry; individual identity to confirm | 1 documented unit |
| Technical details / open items | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. | Collector step-up duty; ONAN/ONAF/ONAF, 60 Hz, three-phase; Grounded-wye / grounded-wye / delta winding configuration; Nominal design H-X impedance: 12.0% on a 132 MVA base |
| Evidence reviewed | J&J-submitted inventory schedule; matching unit-specific technical records to confirm | Serial-specific nameplate and approval drawings reviewed |
| Technical value basis | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. | Supplied nameplate and approval drawings; design values require matching final factory records. |
| Details to confirm | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope | Final tested impedance, insulation levels, complete tap schedule and approved drawing revision; Overall and shipping dimensions, shipping weight, accessory schedule and current preservation |
| Represented condition | Condition and service history require confirmation | Brand new, never used and never energized; approval drawings reviewed |
| Equipment location | Location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Listed for inquiry by J&J; current allocation and release timing require written confirmation | Available; nameplate and approval drawings reviewed; subject to prior sale and written confirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
