Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 26.7 MVA 46/12.47 kV Virginia TransformerJJ-TX-104 | Royal SMIT 525/69 kV Transformers — 3 AvailableJJ-SMIT-525-3 |
|---|---|---|
| Manufacturer | Virginia Transformer | Royal SMIT |
| Rating / output | 16/21.3/26.7 MVA | 240/320/400 MVA; 250 MVA maximum step-down; 90 MVA tertiary |
| Voltage / winding arrangement | 46/12.47 kV | 525/69 kV with 13.7 kV buried-delta tertiary |
| Vector group | Winding connections and phase shift to confirm | YNyn0(d1) — Wye–Wye / buried Delta |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | Not documented; confirm with J&J | ONAN / ONAF / ONAF |
| Impedance and base | Not documented; confirm with J&J | H–X: 12.90% at 240 MVA, 525/69 kV, 85°C |
| Tap changer | Not documented; confirm with J&J | HV OLTC; 472.5–577.5 kV (±10%); 16 raise / 16 lower steps of 0.625% |
| Insulation / BIL | Not documented; confirm with J&J | HV winding 1550 kV / bushing 1675 kV; LV 350 kV; tertiary 150 kV |
| Quantity represented | 1 schedule entry; individual identity to confirm | 3 units |
| Technical details / open items | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. | Three units offered for allocation; availability and 4–8 week shipping schedule confirmed by J&J on October 1, 2026.; Nameplate rating: 240/320/400 MVA with ONAN/ONAF/ONAF cooling. Maximum stated duty: 400 MVA step-up or 250 MVA step-down.; Three-phase, 60 Hz; 525 kV grounded-wye high side, 69 kV wye low side, and 13.7 kV buried-delta tertiary rated 90 MVA.; Copper windings; MR on-load tap changer; HV tap range 472.5–577.5 kV (±10%).; HV BIL: 1550 kV winding / 1675 kV bushing. LV BIL: 350 kV.; Nameplate H-X impedance: 12.90% at 240 MVA base, 525/69 kV, 85°C.; Supplied 2022 factory acceptance test report records Passed for the documented unit. Nameplate, outline drawing and test report available through J&J; match the records to all three units before purchase. |
| Evidence reviewed | J&J-submitted inventory schedule; matching unit-specific technical records to confirm | Supplied nameplate, outline drawing and factory acceptance test report |
| Technical value basis | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. | Supplied nameplate for one documented unit; match the complete package to each of the three offered units. |
| Details to confirm | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope | Matching records for each offered unit, current condition, included accessories and transport scope; Unit-specific factory tests, present preservation and the step-down duty limit |
| Represented condition | Condition and service history require confirmation | 2022 manufacture shown in supplied nameplate; condition and service history confirmed with quotation |
| Equipment location | Location confirmed with quotation | International; dispatch location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Listed for inquiry by J&J; current allocation and release timing require written confirmation | Immediately available; estimated 4–8 weeks to ship; subject to prior sale |
| Availability last confirmed | Request current confirmation | 2026-10-01 |
| Shipping estimate | Request a written dispatch and delivery schedule | 4–8 weeks to ship |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Report reviewed; confirm matching records for each unit |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist