Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 42 MVA 138/34.5 kV Virginia TransformerJJ-TX-102 | 208 MVA 138/34.5 kV Stored Surplus TransformerJJ-TX-201 |
|---|---|---|
| Manufacturer | Virginia Transformer | Manufacturer disclosed in the qualified technical package |
| Rating / output | 25.2/33.6/42 MVA | 125/166/208 MVA |
| Voltage / winding arrangement | 138/34.5 kV | 138 kV HV / 34.5 kV LV |
| Vector group | Winding connections and phase shift to confirm | Grounded wye / grounded wye |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | Not documented; confirm with J&J | ONAN / ONAF1 / ONAF2 |
| Impedance and base | Not documented; confirm with J&J | H–X 9% at 125 MVA (supplied design sheet) |
| Tap changer | Not documented; confirm with J&J | HV OLTC ±8 × 1.25% (±10%); no taps shown on X or Y windings |
| Insulation / BIL | Not documented; confirm with J&J | HV line 650 kV; HV neutral, LV line and LV neutral 200 kV |
| Quantity represented | 1 schedule entry; individual identity to confirm | 1 offered position |
| Technical details / open items | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. | Supplied design data sheet; final unit-specific nameplate and FAT pending.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Technical suitability subject to buyer review; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; Design basis: ONAN/ONAF1/ONAF2, 60 Hz, 65 C temperature rise; grounded-wye high and low sides.; HV OLTC design range ±10%; preliminary 13.8 kV open-delta tertiary. Final unit-specific configuration requires approval.; Design H-X impedance: 9% at a 125 MVA base. This is a design-sheet value, not a final tested result. |
| Evidence reviewed | J&J-submitted inventory schedule; matching unit-specific technical records to confirm | Supplied design data sheet; final unit-specific nameplate and FAT pending |
| Technical value basis | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. | Supplied guaranteed design sheet; these are design values, not final tested values for an individually matched unit. |
| Details to confirm | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope | Final unit-specific nameplate, approved revision, tested impedance/losses and final tertiary arrangement; Conductor, OLTC switch specification, complete accessories, current photos and preservation or manufacturing progress |
| Represented condition | Condition and service history require confirmation | Surplus in storage; service history requires confirmation |
| Equipment location | Location confirmed with quotation | Dispatch location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Listed for inquiry by J&J; current allocation and release timing require written confirmation | Stored surplus offered for allocation; current release terms require written confirmation |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Release, loading and shipping dates confirmed with quotation |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist