Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 220 MVA 345/34.5 kV Prolec GE TransformerJJ-TX-002 | 345/34.5 kV Transformer Production PositionsJJ-TX-204 |
|---|---|---|
| Manufacturer | Prolec GE | Manufacturer disclosed in the qualified technical package |
| Rating / output | 132/176/220 MVA; 46.2/61.6/77 MVA tertiary | 266 MVA offered; final rating requires reconciliation |
| Voltage / winding arrangement | 345/34.5 kV with 13.8 kV delta tertiary | 345 kV HV / 34.5 kV LV |
| Vector group | Grounded Wye–Wye / Delta; clock to confirm | Requires confirmation |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF / ONAF | Not documented; confirm with J&J |
| Impedance and base | Design H–X: 12.0% at 132 MVA | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 documented unit | 2 offered positions |
| Technical details / open items | Collector step-up duty; ONAN/ONAF/ONAF, 60 Hz, three-phase; Grounded-wye / grounded-wye / delta winding configuration; Nominal design H-X impedance: 12.0% on a 132 MVA base | Seller offer summary; exact cooling stages require confirmation.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; The offered summary states 266 MVA. Supplied outlines include different 226 MVA and 266 MVA designs without a confirmed match to each position. Resolve the individual nameplate and design before technical acceptance. |
| Evidence reviewed | Serial-specific nameplate and approval drawings reviewed | Seller offer summary; exact cooling stages require confirmation |
| Technical value basis | Supplied nameplate and approval drawings; design values require matching final factory records. | Received production offer and existing reviewed design package; final individual nameplates and factory tests remain pending. |
| Details to confirm | Final tested impedance, insulation levels, complete tap schedule and approved drawing revision; Overall and shipping dimensions, shipping weight, accessory schedule and current preservation | Match the final design/rating and drawing revision to each offered manufacturing position; Final frequency, cooling/rise, winding duty, impedance/base, BIL, taps, accessories and transport dimensions/weights |
| Represented condition | Brand new, never used and never energized; approval drawings reviewed | Factory manufacturing position; completion pending |
| Equipment location | USA | Dispatch location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; nameplate and approval drawings reviewed; subject to prior sale and written confirmation | 2027 manufacturing positions offered for allocation; current release terms require written confirmation |
| Availability last confirmed | 2026-09-24 | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Projected 2027 completion; shipment and receiving dates require written confirmation |
| Nameplate reviewed | Yes — request the unit package | Not recorded as reviewed; request it |
| Drawings reviewed | Yes — request matching unit drawings | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
