Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare220 MVA 345/34.5 kV Prolec GE TransformerJJ-TX-002260 MVA 345/34.5 kV Siemens TransformerJJ-TX-114
ManufacturerProlec GESiemens
Rating / output132/176/220 MVA; 46.2/61.6/77 MVA tertiary260 MVA
Voltage / winding arrangement345/34.5 kV with 13.8 kV delta tertiary345/34.5 kV
Vector groupGrounded Wye–Wye / Delta; clock to confirmWinding connections and phase shift to confirm
Frequency60 HzNot documented; confirm with J&J
CoolingONAN / ONAF / ONAFNot documented; confirm with J&J
Impedance and baseDesign H–X: 12.0% at 132 MVANot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented1 documented unit1 schedule entry; individual identity to confirm
Technical details / open itemsCollector step-up duty; ONAN/ONAF/ONAF, 60 Hz, three-phase; Grounded-wye / grounded-wye / delta winding configuration; Nominal design H-X impedance: 12.0% on a 132 MVA baseRatings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing.
Evidence reviewedSerial-specific nameplate and approval drawings reviewedJ&J-submitted inventory schedule; matching unit-specific technical records to confirm
Technical value basisSupplied nameplate and approval drawings; design values require matching final factory records.Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match.
Details to confirmFinal tested impedance, insulation levels, complete tap schedule and approved drawing revision; Overall and shipping dimensions, shipping weight, accessory schedule and current preservationIndividual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope
Represented conditionBrand new, never used and never energized; approval drawings reviewedCondition and service history require confirmation
Equipment locationUSALocation confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityAvailable; nameplate and approval drawings reviewed; subject to prior sale and written confirmationListed for inquiry by J&J; current allocation and release timing require written confirmation
Availability last confirmed2026-09-24Request current confirmation
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedYes — request the unit packageNot recorded as reviewed; request it
Drawings reviewedYes — request matching unit drawingsNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales