Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 300 MVA 138/34.5 kV Georgia TransformerJJ-TX-001 | 42 MVA 138/34.5 kV Virginia TransformerJJ-TX-102 |
|---|---|---|
| Manufacturer | Georgia Transformer | Virginia Transformer |
| Rating / output | 180/240/300 MVA; 63/84/105 MVA tertiary | 25.2/33.6/42 MVA |
| Voltage / winding arrangement | 138/34.5 kV with 12 kV buried-delta tertiary | 138/34.5 kV |
| Vector group | YNyn0+d1 | Winding connections and phase shift to confirm |
| Frequency | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 documented unit | 1 schedule entry; individual identity to confirm |
| Technical details / open items | ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group YNyn0+d1; Measured 138/34.5 kV impedance: 9.67% on a 180 MVA base; Copper windings, conservator system, Type II mineral oil, and HV OLTC | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. |
| Evidence reviewed | Serial-specific nameplate reviewed | J&J-submitted inventory schedule; matching unit-specific technical records to confirm |
| Technical value basis | Serial-specific nameplate reviewed | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. |
| Details to confirm | Matching technical records, current condition, complete equipment scope and transport details | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope |
| Represented condition | Brand new, never used and never energized; 2020 nameplate reviewed | Condition and service history require confirmation |
| Equipment location | USA | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available for sale — confirmed by J&J October 8, 2026; quotation and release terms on request | Listed for inquiry by J&J; current allocation and release timing require written confirmation |
| Availability last confirmed | 2026-10-08 | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist