Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareMitsubishi 60 MW Biomass Steam Power PlantJJ-TUR-016GE LM2500 G4 36.1 MW Gas Turbine PackageJJ-TUR-003
ManufacturerMitsubishiGE
Rating / output60 MW reported output36.1 MW reported output
Voltage / winding arrangement13.8 kVGenerator voltage to confirm
Vector groupNot applicable; generator connection to confirmNot applicable; generator connection to confirm
Frequency60 HzFrequency to confirm
CoolingNot documented; confirm with J&JNot documented; confirm with J&J
Impedance and baseNot documented; confirm with J&JNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented1 offered plant1 offered package
Technical details / open itemsManufacture year and commercial operation start are different dates; request nameplate and commissioning records.; Confirm steam conditions, boiler/fuel-handling equipment, generator, controls and dismantling responsibilities.; Current availability and technical evidence require written reconfirmation.Request matching turbine and generator records, maintenance history and package drawings.; Do not combine this single 36.1 MW position with the two 33.6 MW LM2500+G4 packages.; Current availability and delivery require written reconfirmation.
Evidence reviewedWritten equipment offer; unit-specific technical records and identity to confirmWritten equipment offer; unit-specific technical records and identity to confirm
Technical value basisReceived equipment offer; ratings, history and scope are representations until matched to the selected package.Received equipment offer; ratings, history and scope are representations until matched to the selected package.
Details to confirmMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scopeMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope
Represented conditionUsed; low-hour condition represented, exact hours to confirm2011 manufacture reported; condition and hours to confirm
Equipment locationLocation confirmed with quotationLocation confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered subject to prior sale; current availability and release schedule to confirmOffered subject to prior sale; current availability and release schedule to confirm
Availability last confirmedRequest current confirmationRequest current confirmation
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itNot recorded as reviewed; request it
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales