Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | MTU 16V4000G63 2250 kVA Container GeneratorJJ-GEN-007 | Wärtsilä 20V34SG Natural Gas Generator Plant — 16 SetsJJ-GEN-003 |
|---|---|---|
| Manufacturer | MTU | Wärtsilä |
| Rating / output | 2250 kVA reported output | 141.18 MW reported total package output |
| Voltage / winding arrangement | 400 V | 11 kV |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | 50/60 Hz offered; configuration to confirm | 50 Hz |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | Quantity to confirm | 16 offered sets |
| Technical details / open items | Confirm the actual nameplate frequency, engine speed and output rating for the specific unit.; An offered 50/60 Hz description does not establish identical output or automatic conversion at both frequencies.; Request hours, service records, enclosure scope, switchgear and release schedule. | Request individual engine ratings, hours, starts, overhaul history and the complete scope schedule.; The stated package total is an offer figure, not a guaranteed net site output.; Confirm fuel composition, cooling, emissions controls, switchgear, dismantling and transport responsibilities. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Installed frequency/speed, duty and kW at actual power factor, quantity, hours, condition and scope | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope |
| Represented condition | Service history and present condition to confirm | Used; unit-specific service history requires review |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm | Offered subject to prior sale; current availability and release schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
