Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareSix CAT 3516C 2000 kW / 2500 kVA Prime Diesel GeneratorsJJ-GEN-002Wärtsilä 20V34SG Natural Gas Generator Plant — 16 SetsJJ-GEN-003
ManufacturerCaterpillarWärtsilä
Rating / output2000 kW / 2500 kVA prime per unit; 12 MW offered package141.18 MW reported total package output
Voltage / winding arrangement11 kV11 kV
Vector groupNot applicable; generator connection to confirmNot applicable; generator connection to confirm
Frequency50 Hz50 Hz
CoolingNot documented; confirm with J&JNot documented; confirm with J&J
Impedance and baseNot documented; confirm with J&JNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented6 offered units16 offered sets
Technical details / open itemsReported engine speed: 1500 RPM.; The offer identifies a prime rating; do not substitute this rating for standby or continuous duty.; Exact unit hours, condition, maintenance records, price and release schedule are being confirmed.Request individual engine ratings, hours, starts, overhaul history and the complete scope schedule.; The stated package total is an offer figure, not a guaranteed net site output.; Confirm fuel composition, cooling, emissions controls, switchgear, dismantling and transport responsibilities.
Evidence reviewedWritten equipment offer; unit-specific technical records and identity to confirmWritten equipment offer; unit-specific technical records and identity to confirm
Technical value basisReceived equipment offer; ratings, history and scope are representations until matched to the selected package.Received equipment offer; ratings, history and scope are representations until matched to the selected package.
Details to confirmMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scopeMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope
Represented conditionUsed; reported 2014 manufactureUsed; unit-specific service history requires review
Equipment locationLocation confirmed with quotationLocation confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered subject to prior sale; current availability and release schedule to confirmOffered subject to prior sale; current availability and release schedule to confirm
Availability last confirmedRequest current confirmationRequest current confirmation
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itNot recorded as reviewed; request it
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales